WP5: Testing.
Besides the introduction of the fundamental control design and analysis tools, PADECOT aims at the validation and implementation of the developed control/estimation algorithms. WP5 includes activities for the numerical implementation and testing of the proposed control/estimation algorithms as well as for the validation of the algorithms utilizing traffic data. The activities of WP5 can be organized in the following tasks.
Task 5.1: Development of a software tool for implementing numerically the developed control and estimation
algorithms.
Task 5.2: Simulation-based testing of the proposed algorithms, employing the developed software tool, using
fictitious traffic data.
Task 5.3: Testing of the control/estimation schemes with real traffic data, employing the developed software
tool, if the algorithms in Task 5.2 show good performance, if not, the software library is refined.